Rehabilitation of filtration section in the first sterilization station

حول هذا المشروع:

The basins in the left section of the drinking water treatment plant were rehabilitated. The work included removing old resides, replacing the bases of sand filters and filtration ele-ments, as well as the raw water circuits, treated water circuits, electrical control systems, and air circuits, Architectural restoration was also carried out, along with the integration of GRP panel technology. These works were implemented under the supervision of a non-governmental organization (NGO)

حالة المشروع:

المشاريع المنجزة

المدة:

120 يوم

المحافظة:

Aleppo

سنة المشروع:

2025

الطرف المتعاقد:

ZOA

التصنيف:
المشاريع المنجزة
الوسوم:
Aleppo, Rehabilitation, ZOA