Qualitative Summary of the Rehabilitation Project for Sanitary Facilities in 4 Schools – Kiswah, Rif Dimashq

About This Project

Key Interventions:

  • Comprehensive rehabilitation of toilets, handwashing stations, and water coolers after demolishing damaged fixtures.
  • Construction of 4 new restrooms for people with disabilities (one in each school) from scratch, equipped with support bars and accessible toilets.
  • Complete waterproofing of sanitary fixtures, and installation of modern sanitary facilities (toilets, washbasins, faucets).
  • Radical resolution of the internal sewage network (which was nearly non-functional) and connection to the septic tank.
  • Solar energy systems (panels, batteries, pumps) + lighting extensions for the bathrooms + new water tanks.

Targeted Impact:

  • A safe and clean learning environment for thousands of students, with effective inclusion of people with disabilities.

Continuity of sanitation services during power outages.

Status

in Progress

Started Year

2026

durations

--

Contracting party

OXFAM

Governorate

Kiswah , Rif Dimashq

Category
under construction
Tags
in Progress, Rif Dimashq, School