A project to rehabilitate four drinking water wells in the Al-Makaser area (Douma Water Unit), aimed at enhancing the efficiency of water sources and ensuring the supply of clean and safe water to the city of Douma.

The project seeks to connect the wells to a line exempt from rationing to guarantee a sustainable water flow to the residents of Douma, following years of conflict that have adversely affected the infrastructure.

Key Objectives

  • Enhance the efficiency of drinking water sources in Douma
  • Ensure the continuity of clean water supply to residents
  • Connect the wells to a line exempt from rationing
  • Reduce malfunctions and improve the reliability of the pumping system

 

Scope of Work

  • Installation of new submersible pumps and new rising mains for all four wells
  • Rehabilitation and renewal of wellhead equipment
  • Installation of new electrical control panels for each well, including operational protections and automatic operation
  • Maintenance and reinforcement of steel cages to protect well equipment
  • Connection of the well control panels to the main electrical transformer station via new underground cables

 

Technical Details

  • Well depths reach up to 400 meters
  • Execution according to the highest standards of precision and efficiency

Expected Impact

  • Improved supply of clean and safe drinking water to Douma
  • Reduced water interruptions through a line exempt from rationing
  • Improved pumping system efficiency and reduced malfunctions
  • Service to thousands of families in Douma and surrounding areas
Status

Completed projects

durations